Date Service Type Miles/Hrs Comments Tech Cost
09/01/2015  Repairs  0.000  new tire 1EB  Clay Rush  0.00 
05/25/2014  Repairs  0.000  new lightbulb and cover  Clay Rush  0.00 
04/18/2014  Repairs  0.000  new gear box and knuckles 2EB  Clay Rush  0.00 
04/15/2014  Repairs  0.000  new pressure switch in box  Clay Rush  0.00 
07/01/2013  Repairs  0.000  new motor 3P  Woofter  0.00 
06/05/2013  Check Gear Boxes  0.000    Clay Rush  0.00 
08/20/2012  Repairs  0.000  Changed 3PB tire  Clay Rush  0.00 
06/25/2012  Repairs  0.000  Sam fixed 3 spots where safety wire had bad connection  Woofter  0.00 
05/07/2012  Repairs  0.000  Replaced swan on 5th tower outer boomback. Aired up 2PB and 3PB. 2PB was flat.  Clay Rush  0.00 
07/01/2011  Repairs  0.000  Tightened bolts on spans between 3rd and 4th from end   Clay Rush  0.00 
06/21/2011  Repairs  0.000  Tightened bolts on spans between 2nd and 3rd from end   Clay Rush  0.00 
06/09/2011  Water Meter Reading  0.000  started .75 SW  Clay Rush  0.00 
05/20/2011  Repairs  0.000  changed tire 2pb  Clay Rush  0.00 
Total: 0.00