Date Service Type Miles/Hrs Comments Tech Cost
06/18/2022  Repairs  0.000  New pipe at pivot  Clay Rush  0.00 
06/18/2022  Repairs  0.000  New center drive and both gearboxes on 1P  Clay Rush  0.00 
03/27/2018  Repairs  0.000  New gearbox and knuckle 2EB  Clay Rush  0.00 
03/27/2018  Repairs  0.000  New center drive and checked tower box 2EB  Western Sprinkler  0.00 
05/19/2014  Repairs  0.000  new gearbox 4EB. new knuckles. new contactor  Clay Rush  0.00 
04/04/2014  Repairs  0.000  woofters tied pivot stand back down to pad. east side was up in air  Woofter  0.00 
06/20/2013  Repairs  0.000  Sam replaced some heater dealy on end tower  Woofter  0.00 
06/22/2012  Repairs  0.000  replaced electric motor on 3E  Woofter  0.00 
06/12/2012  Repairs  0.000  Had to put clamp back on connection between elbow and pipe out of ground  Clay Rush  0.00 
07/20/2011  Repairs  0.000  replaced gear box 2PF. Les from Woofter   Clay Rush  0.00 
06/24/2011  Water Meter Reading  362.572  start 1.5 W  Clay Rush  0.00 
06/16/2011  Repairs  0.000  new end hose and half spray nozzle  Clay Rush  0.00 
06/16/2011  Water Meter Reading  0.000  started 1.5 E by N drive  Clay Rush  0.00 
06/07/2011  Water Meter Reading  0.000  started .75 NW  Clay Rush  0.00 
04/19/2011  Check Gear Boxes  0.000  1pb old style full water  Clay Rush  0.00 
03/25/2011  Air Up Tire  0.000  aired up all tires   Clay Rush  0.00 
Total: 0.00