Date |
Service Type |
Miles/Hrs |
Comments |
Tech |
Cost |
03/02/2015 |
Repairs |
0.000 |
new manifolds and some new fertilizer hoses |
Clay Rush |
0.00 |
02/26/2015 |
Repairs |
0.000 |
New hydraulic hose left side up and down |
Clay Rush |
0.00 |
01/09/2015 |
Repairs |
0.000 |
new hydraulic hoses on left outer wing |
Clay Rush |
118.00 |
03/18/2012 |
Repairs |
0.000 |
Welded left wing around main pin and between plate and main beam in front of pump |
Neal Rush |
0.00 |
03/14/2012 |
Repairs |
0.000 |
Add flow meter. Welded up and down bracket and bent rod back |
Clay Rush |
0.00 |
07/08/2011 |
Repairs |
0.000 |
painted right wing where welding was done |
Clay Rush |
0.00 |
04/13/2011 |
Repairs |
0.000 |
welded right wing on |
Clay Rush |
0.00 |
03/22/2011 |
Repairs |
0.000 |
Added bigger pump |
Clay Rush |
0.00 |
Total: |
118.00 |