Date Service Type Miles/Hrs Comments Tech Cost
03/02/2015  Repairs  0.000  new manifolds and some new fertilizer hoses  Clay Rush  0.00 
02/26/2015  Repairs  0.000  New hydraulic hose left side up and down  Clay Rush  0.00 
01/09/2015  Repairs  0.000  new hydraulic hoses on left outer wing  Clay Rush  118.00 
03/18/2012  Repairs  0.000  Welded left wing around main pin and between plate and main beam in front of pump  Neal Rush  0.00 
03/14/2012  Repairs  0.000  Add flow meter. Welded up and down bracket and bent rod back  Clay Rush  0.00 
07/08/2011  Repairs  0.000  painted right wing where welding was done  Clay Rush  0.00 
04/13/2011  Repairs  0.000  welded right wing on  Clay Rush  0.00 
03/22/2011  Repairs  0.000  Added bigger pump  Clay Rush  0.00 
Total: 118.00